Project name Engineering content Construction time
Supply & Installation of Heat Exchange Stations Equipment for Yingkou Dashiqiao Component in Liaoning Third Medium Cities Infrastructure Project (World Bank Loan) 46 Heat Exchange Stations 2009-2011
Alkali Recovery Combustion Section Sub-project & Alkali Recovery Evaporation Section Sub-project, Shandong Hai River Basin Pollution Control Project 2450t/d (Solid Alkali Recovery) 2008-2013
Melamchi Water Supply Project, Construction of Headworks and Tunnel, Nepal 27km 2009
Zhengzhou-Xi’an Railway Project, Lot 104 Isolating Switch and Load Switchgears for Ministry of Railway (ADB Loan) 345 sets 2009-2010
Package No. 2-1, 2-2, 2-3, 3, 7, 8 and 9 of Hefei Sub-project, Anhui Environment Improvement Project Welding Steel Pipes, Seamless Steel Pipes, SCADA System, Natural Gas Refueling Station and Process Equipment 2004-2008
Package No. 2-1, 2-2, 2-3, 3, 7, 8 and 9 of Hefei Sub-project, Anhui Environment Improvement Project Welding Steel Pipes, Seamless Steel Pipes, SCADA System, Natural Gas Refueling Station and Process Equipment 2004-2008
Package No. 2A-3 of Desulphurization/HCN Removal Plant Sub-project and Package No. 6B-2 of Stainless Steel Slag Treatment Sub-project, Taiyuan Environmental Improvement Project Desulphurization/HCN Removal Plant-General Equipment and Stainless Steel Slag Treatment Sub-project-General Equipment 2007-2008
Package No. 3, 5 and 13 of Tongling Yaxing Coking Gas Limited Liability Company (TCG) Pollution Treatment Sub-project, Anhui Acid Rain Control and Environmental Improvement Project Coke Oven Auxiliary Equipment, Installation and Construction Materials and Laboratory Equipment 2006-2008
Package No. 1, 2, 3 and 6 of Fuyang Sub-project, Anhui Environment Improvement Project Welded Pipe, Valve, Pressure Regulator, etc., Machine & Vehicle and SCADA System 2004-2007
Package No. 4, 9 and 12 of Xinyang Sub-project, Henan Environment Improvement Project Antisepsis and Cathode Protection, Filling Gas Station and Working & Maintenance Equipment 2004-2006
Package No. 3 and 6 of Ma’anshan Sub-project, Anhui Environment Improvement Project Vehicle Gas Refueling Station and Pipe Materials 2005-2006
Package No. 2, 3 and 5 of Chuzhou Sub-project, Anhui Environment Improvement Project Valves & Pressure Regulator, Pipes and Mother Gas Station System 2004-2005
Package No. 5 of Jiaozuo Sub-project, Henan Environment Improvement Project High Pressure Pipeline 2004-2005
Package No. 2 of Tongling Sub-project, Anhui Environment Improvement Project Pipes 2004-2005
Heat Supply Network Automation Sub-project, Comprehensive Energy-saving Cogeneration Project for Jinan City, Shandong Province (European Investment Bank) 441 Heat Exchange Stations 2012-2014